
Get Your Free ADU Cost Estimate
Want to know how much your ADU will really cost? Don’t guess – get real numbers in seconds! Our calculator gives you honest prices based on hundreds of ADU projects we’ve built right here in San Diego.
Average ADU Cost in San Diego
Quick answer: most San Diego ADUs cost about $150,000–$450,000+ all in. A junior ADU or garage conversion sits at the low end, an attached ADU in the middle, and a new detached backyard home at the top.
Prices on this page were last reviewed in November 2026 and include design, permits, utilities and construction. Use them to budget, then get a site visit for an exact number.
Cost by ADU type
| ADU type | Typical San Diego cost | What it is |
|---|---|---|
| Junior ADU (JADU) | $120,000 – $200,000 | Up to 500 sq ft carved out of your existing home, with its own entrance and an efficiency kitchen. |
| Garage conversion | $150,000 – $275,000 | Turns an existing garage into a full living unit. |
| Attached ADU | $200,000 – $350,000 | A new unit that shares a wall with your house. |
| Detached ADU | $250,000 – $500,000+ | A standalone backyard home with its own kitchen and bathroom. |
Cost per square foot
Smaller ADUs cost more per square foot because the kitchen, bathroom, permits and utility work don’t shrink with the floor plan. As a rough guide, a 400 sq ft unit often lands around $400 per square foot, and an 800 sq ft unit around $350 per square foot.
What Drives ADU Costs
1. Size and type
A conversion reuses walls, a roof and a slab you already have. A detached ADU needs all new foundation, framing, roof and utility runs, so it costs the most.
2. Kitchen, bathroom and finishes
| Item | Typical range (basic to high-end) |
|---|---|
| Kitchen | $8,000 – $40,000+ |
| Bathroom | $6,000 – $35,000+ |
| Flooring | $3,000 – $20,000+ |
3. Utilities and site work
- Utility connections (water, sewer, electrical, sometimes gas): $5,000 – $15,000
- Longer runs from the street, a sewer lateral upgrade or a new electrical panel push this higher.
- Sloped lots, tight backyard access and soil issues add foundation and labor cost.
4. Design, permits and fees
- Plans and permits: $3,000 – $8,000 for most projects
- Impact fees: $0 for ADUs of 750 sq ft or less under state law; larger ADUs can be charged, but only in proportion to the main house
- Water and sewer capacity fees from the utility may still apply

California ADU Rules That Affect Your Cost
State law makes ADUs easier to build than most home additions. Key rules from the California Department of Housing and Community Development (HCD):
- No impact fees on small units: cities can’t charge impact fees on ADUs under 750 sq ft or on JADUs. Larger ADUs can only be charged proportionally.
- A deadline for your city: a complete ADU application must be approved or denied within 60 days.
- Small setbacks: detached ADUs generally need only 4 feet from side and rear property lines.
- No owner-occupancy rule for ADUs: you don’t have to live on the property to build or rent an ADU. Junior ADUs that share a bathroom with the main house are the exception.
Coastal zone lots, hillside lots and HOA rules can add steps. We check the rules for your exact address before design starts.
ADU Timeline
- Design and engineering: usually 1–3 months.
- City review: up to 60 days once your application is complete, plus any correction rounds.
- Construction: a conversion is usually faster; a detached ADU takes longer because everything is built new.

ADU Examples and Budgets
| Example | What it includes | Typical budget |
|---|---|---|
| Home office plus | 500 sq ft with an office, small kitchen and bathroom | $180,000 – $240,000 |
| Family suite | 600 sq ft attached ADU with one bedroom, full kitchen and bathroom | $220,000 – $280,000 |
| Rental unit | 800 sq ft detached ADU with two bedrooms, full kitchen and nicer finishes | $280,000 – $350,000 |
Paying for Your ADU
Most homeowners use cash, a home equity loan or HELOC, a cash-out refinance, or a construction loan. Some lenders will count expected rent from the ADU. Rates change often, so check current options with your bank or credit union.
How to Save Without Cutting Corners
- Convert before you build new: a garage or JADU conversion reuses what you already have.
- Stay at or under 750 sq ft to avoid impact fees.
- Keep the layout simple: a rectangle with one wet wall for the kitchen and bath is the most efficient.
- Place it near utilities to shorten water, sewer and electrical runs.
Questions to Ask Your ADU Builder
- Is your license active? (Look it up on the CSLB website.)
- Does your price include design, engineering, permits and utility connections?
- Who handles the city application and corrections?
- What’s not included (appliances, landscaping, fencing)?
- Can I see ADUs you’ve built?
Why Homeowners Choose Classic Home Contractors
- Licensed: California contractor license CSLB #1115508.
- No-surprise pricing: a clear, line-item proposal before work starts.
- Daily owner supervision: the owner is on your project, not just a crew.
- Guaranteed project timeline: you know when the work starts and finishes.
See our San Diego ADU building services, or our ADU pages for Carmel Valley, Encinitas and Rancho Bernardo. Thinking about building up instead? Read how to add a second story or see our room additions.
ADU Cost FAQ
How much does an ADU cost in San Diego?
Most San Diego ADUs cost about $150,000–$450,000+ all in. Junior ADUs run about $120,000–$200,000, garage conversions $150,000–$275,000, attached ADUs $200,000–$350,000 and detached ADUs $250,000–$500,000+.
What is the cheapest type of ADU to build?
A junior ADU inside your existing home or a garage conversion is usually the least expensive, because you reuse existing walls, roof and foundation.
Do I have to pay impact fees on an ADU in San Diego?
Not on smaller units. California law bars impact fees on ADUs under 750 square feet and on junior ADUs. Larger ADUs can only be charged in proportion to the main house. Utility capacity fees may still apply.
How long does it take to build an ADU?
Plan on a few months for design and city review, which must decide on a complete application within 60 days, plus construction. Conversions usually finish faster than new detached units.
Do I have to live on the property to build an ADU?
No. California has removed owner-occupancy requirements for ADUs. Junior ADUs that share a bathroom with the main house are the exception.
Get an Exact Price for Your ADU
Tell us about your property and we'll give you a clear, line-item quote. No pressure, no surprises.
About the Author
